At Precision Technology, we’re committed to maintaining short lead times in order to ensure that our customers receive their orders swiftly. Our lead times—5 to 6 weeks—are some of the shortest in the industry. Plus, we can expedite your order when needed.
Benefits of Lean Manufacturing
“Our lead times – 5 to 6 weeks – are some of the shortest in the industry.”
We continually deliver on our short lead times thanks to our practice of Lean Manufacturing. Our lean practices allow us to do more with less, therefore reducing our costs while enabling us to maintain a high-level of productivity. We’ve also adopted a variety of production practices aimed at eliminating and reducing waste, which also save time and money. Some of these practices include: batch size reductions, value stream mapping, 5S, manufacturing cells, and a one-piece flow concept. All of these techniques combined allow us to deliver turn-key castings quickly and at a great value.